Flynn Park – Hamilton City Council
Less Poles, More Light: Efficient Design at Flynn Park
Pure collaborated with Hamilton City Council to upgrade the lighting at 19 fields across seven parks throughout Hamilton, including KoriKori, Ashurst, Gower, Flynn, Galloway, Porritt, and Enderley. Our team provided a full turn-key solution, managing every stage of the project – from initial design and planning to the final installation – offering a seamless experience for the council and the community.
Flynn Park features a football field equipped with training level lights set at 100 lux. The original plan called for six poles due to the park’s proximity to neighbouring boundaries. However, leveraging our in-house design team and advanced spill control floodlights, we successfully met all specifications with only four poles. This change resulted in significant cost savings for the council while providing a more environmentally friendly solution.
We installed a lighting control system that allows for precise adjustments based on zoning, dimming needs, and usage patterns. This not only enhances the user experience but also contributes to energy savings and operational cost-effectiveness.
Lighting Control That Delivers Savings and Superior Performance
WHAT OUR CLIENTS SAY
“Having the opportunity to play sport helps shape thriving, healthy, vibrant cities, and these upgrades will see more Hamiltonians getting involved and enjoying our city’s fabulous sporting fields and facilities”
Mayor Paula Southgate, Mayor of Hamilton City
“Daniel and his team did a great job designing and installing the sportsfield lighting for Hamilton City Council, especially given the challenges of the wettest summer on record and tight deadlines to ensure the fields were lit for the FIFA womens world cup. The project was kept on track and delivered on time and the field lighting was perfect to meet FIFA standards. The communication was excellent and the team was proactive in overcoming any challenges they faced. Was a great experience to work with Daniel and all the team throughout the project.”
Doug Warwick, Project Engineer, Neuflow Projects